Component Process
CHRA/Cartridge Assembly
Complete Turbo Assembly
Logistic Service
Component Process

The vast majority of the Plan's machinery is imported from Europe and Japan, to fullfil OE quality requirements.Precision Machining & Dynamic Balandng Techniques, inline inspection Equipment & Automated Assembly Production Line, Ensuring High Quality Products.

OKUMA
Shaft CNC
OKUMA
Shaft Grinder
SCHENCK
Automatic Shaft Balancing
MAZAK
Hole Punder
MAZAK
Wheel CNC
SCHENCK
Automatic Balancing Wheel
TSUGAMI
Wheel Grinder
TSUGAMI
Bearing Housing Welding
VICI
Optical Measurement Instrument
CHRA/Cartridge Assembly

Utilizing precision machining & core dynamic balancing techniques, along with inline inspection equipment and automated assembly production lines, to ensure high performance and quality products.
1. Broad model coverage

2. Quick model update

3. Dedicated discharge equipment for the easy deformation parts, which would avoid knocking parts together, or twisting each other

4. Material Picking System for the short packing parts, which would guide the operator to pick up the material and put the wrong alarm

5. Computer controlled production process to prompt assembly steps in real time, which records production information as well as process parameters

6. 100% automatic detection for the airtightness of each and every cartridge

Assemble and Detection
Calling Program
VSR (vibration sorting rig) core component balancing
VSR Core Component mapping
Modification to Core Components
Assemble and Detection procedure
Core Component Assembly
Comprehensive Testing of Core Components
High-speed Dynamic Balancing of Core Components
Complete Turbo Assembly

Precision Machining & Dynamic Balancing Techniques, Inline Inspection Equipment & Automated Assembly Production Line, Ensuring High Quality Products.
1. Broad range coverage
2. Quick model update
3. The operating procedure for each model is independent. Electronic operating files run in concert with product assembly tools. The illustrations that are presented to the operator offer the most intuitive operating instructions
4. Lean Management Systems govern the factory's entire equipment layout, with the whole process using a conveyor system to efficiently revolve materials
5. Material Picking System is utilized for the short packing of parts, which guides the operator to pick up the correct part and raises an alarm if an incorrect item is selected
6. The Casting assembly uses a program-controlled servo system to ensure product consistency
7. Again, the entire production process is computer controlled so as to prompt the assembly steps in real time, and also record production information and process parameters
8. 100% automatic detection for the airtightness of each Turbocharger assembly

Housing Assembly and Inspection
Housing Assembly and Inspection
Actuator Calibration
Air Tightness Testing
Air Tightness Testing
Visual Inspection
Logistic Service

To support global customers' demand for fast delivery, JRONE has now established a 10,000 sqm logistic center in Wuxi, CHINA, housing around 9850 SKUs.The warehouse operates using ERP & WMS management systems with QR code.The standard 'door to door' AIR shipment delivery from point of order is 7 days, with 'urgent' orders available to ship (dependent upon size) within 48hrs. What's more, to further improve our delivery of goods, JRONE is set to establish warehouse facilities in Europe, North America and South America in the near future.​

4500㎡ Warehouse Ensure Adequate Inventory
5500 Positions for Turbo, Core and Housings
ERP & WMS Systems
QR code implementation
7 days for standard order turnaround
2 days for urgent orders